INFORMER Q2 2024 Edition

Your copy of the #15 iNFORMER Magazine, covers everything that’s happened at Inforce for the past quarter!

Download your copy and learn:

  • The floor design and optimisation of a large steel fabrication facility in Queensland.
  • Future proofing 13,000m2 of floor slab and pavement slabs in the heart of wine country.
  • Insights into NCAT and MNROAD test tracks and the benefits of adopting ACE Aramid fiber in the design.