Issue 9: The iNFORMER

INFORMER September 2022 Edition

HEAVY DUTY FOUNDATION SLABS FOR CORSON GRAIN SILOS

Working closely with both the project engineer and the construction company, iNFORCE was able to reduce the conventional steel requirement for 5 super-sized silo foundations. This provided both program savings and real tangible cost savings for both the client and the contractor.

In September’s edition of the iNFORMER we showcase this project plus several other projects where we provided our clients with optimised slab designs utilising the benefits of fibre reinforcement.

You can also learn about dowel joints, and discover best-practices for slab penetration isolation to minimise uncontrolled cracking.

Download the PDF below.

Contact

Let’s talk
about it

We understand that choosing the correct solution and type of product is essential for the success of any project. inForce GLOBAL has a technical support team with many years of concrete industry experience and successful project applications and are ready to help you find the right solution for your application.

0800 463 672

Monday to Friday.

9am to 5pm.

Saving Calculator